Winter is a good time to remodel a pool in the Inland Empire. See why →
Close-up of a modern rectangular spa glowing at dusk beside floor-to-ceiling glass and a covered patio

Pool remodeling · Corona & Riverside County

Pool Remodels.
Premium Finishes.
Upfront Pricing.

Premium plaster, waterline tile and coping remodels with timeless finishes, upfront pricing, and a modern remodel experience built around you.

Prices are based on a pool up to 30′ × 15′ with a 7′ × 7′ spa, all flat. Final pricing is confirmed after an on-site assessment.

  • CA License C-53 #1108765Licensed California contractor
  • Upfront package pricingThree surface packages, starting at $11,500
  • Free on-site assessmentFinal price confirmed after we see your pool
  • Remodels & new poolsFrom surface refreshes to new construction

Surface packages

Most Popular Packages.

Choose from our most popular remodel packages, built with premium craftsmanship. Published prices are for a pool up to 30′ × 15′ with a 7′ × 7′ spa. Every package includes chip-out, haul-away and new white plaster. Move up to add waterline tile, then coping.

Package 01 · Plaster

Essential Refresh

A bright, new white plaster interior for a pool whose surface has worn out.

$11,500Package price

  • Chip-out of the existing plaster
  • Haul-away of removed material
  • New white plaster

Package 03 · Plaster + Tile + Coping

Complete Transformation

Every surface you see, renewed: new coping, new waterline tile and new white plaster.

$24,500Package price

  • Chip-out of the existing plaster, waterline tile and coping
  • Haul-away of removed material
  • Prep of the original surface for the new tile
  • New porcelain, pool-rated waterline tile
  • New coping installationGeometric / rectangle pools: stone coping — Blue Stone Marble (Modern Brushed & Sandblasted), Shell Stone Limestone or Crema Pearl Marble. Freeform pools: concrete pour-in-place coping.
  • New white plaster

Pricing basis — all three packages

  • Fixed, published package prices for a pool up to 30′ × 15′ with a 7′ × 7′ spa.
  • All-in for the scope listed on each package, including that spa.
  • The pool must be all flat.
  • A raised spa or raised bond beam (raised pool wall) is additional cost.
  • Pools larger than 30′ × 15′ are quoted after an on-site assessment.

Final pricing is confirmed after an on-site assessment.

How we work

Craftsmanship, reliability and honesty, with clear scope on the page, upfront pricing for the stated size, and work managed from chip-out to finish.

Upgrade · add to any package

Mini-Pebble Interior Finish

+$2,800added to any package

Upgrade the interior finish on any package: a mini-pebble finish replaces the white plaster. Choose it with Essential Refresh, Signature Surface or Complete Transformation.

Close-up of a pebble pool interior finish with a rounded bench edge

See the full comparison

New Pools. Same Craftsmanship.

Full new construction from the ground up, with the same upfront approach you see in our remodel packages.

What heating rules apply to a new pool?

For building permit applications filed on or after January 1, 2026, California's 2025 Energy Code generally requires that a new residential pool's primary heater be a heat pump or a solar heating system, or a combination of the two. A gas heater may be used only as backup, not as the only heater. Outdoor pools heated with gas or electricity (including a heat pump) also need a cover. These are state energy-code rules, not part of our surface packages. Heating for a new pool is scoped after an on-site consultation, and your local building department has the final say on what applies to your project.

Winter remodel season

Plan in Winter. Swim When It Warms Up.

In Southern California most families use the pool least in winter, so that’s when being without it costs the least.

Less time without your pool

Being out of the pool for a while matters far less in winter than in July.

Ready for spring and summer

Getting the work done in the off-season means a finished pool when swim season comes around.

Decide without a rush

Take time to choose plaster or mini-pebble, tile and coping, with an on-site assessment first.

Baymar projects

Recent Work. Finished Pools.

Temecula / De Luz project: blue pool with white in-pool loungers, a fire bowl at the far corner and lounge chairs on the deck, with green hills behind
Baymar projectHillside pool with in-pool loungersTemecula / De Luz: new construction with a vanishing edge pool and outdoor kitchen. A fire bowl, in-pool loungers and a hillside view.
Temecula / De Luz project: aerial view of a lit pool with an attached spa and in-pool loungers, a patio with a turf diamond grid, and a fire feature
Baymar projectPool, spa & patio from aboveTemecula / De Luz: new construction with a vanishing edge pool and outdoor kitchen. Aerial view: pool with attached spa, turf-grid patio and fire feature.
Baymar projectPool, spa & turf-joint patioRecent Baymar project.
Bronze-toned hex-pattern fire bowl with flames on a white stone pedestal at the edge of a pool, hills in the background
Baymar projectFire bowl at the water’s edgeTemecula / De Luz new construction. A fire bowl on a stone pedestal, set at the pool edge.
Baymar projectStacked-stone wall & clear waterRecent Baymar project.
Baymar projectCoping & concrete demoFor a major remodel in Newport Beach.

See all project photos

“I couldn't be happier with my beautiful pool built by Baymar! Bryan and his team demonstrated professionalism and expertise from our first consultation to the very end of my project.”

Haley G. · Google review

“I had a great experience working with Bryan from Baymar. I truly can't recommend him enough. His communication was excellent throughout the entire process.”

Sandra G. · Google review

“We went through at least 5 different pool companies for consults before we chose Baymar. He designed what we had in mind and we fell in love.”

Killa R. · Google review

Excerpts from Baymar’s Google reviews. Read all 7 reviews on Google (opens in a new tab)

How it works

Four Clear Steps.

  1. Request an Estimate

    Call, email or send the form. Tell us about your pool and what you want to change.

  2. On-Site Assessment

    We visit, look at your pool and spa, and confirm what the project needs.

  3. Scope & Materials

    Choose your package, tile and coping (and the mini-pebble upgrade if you want it). We confirm final pricing.

  4. Renovation

    Chip-out, haul-away, prep and installation, managed from start to finish.

Get your free estimate

Takes about 30 seconds. We reply during business hours.

Package prices assume a pool up to 30′ × 15′ with a 7′ × 7′ spa; final pricing is confirmed after an on-site assessment.

Or call 951-901-3014 · Mon–Fri 7:00am–3:30pm
CA License C-53 #1108765

5.0 stars on Google · 7 reviews (opens in a new tab)